HIGH POWER Q/V-BAND DIPLEXERS FOR GROUND STATIONS (ARTES 5.1 6B.025) - EXPRO PLUS

Description

To design broadband high power diplexers for next generation of broadband telecommunication satellite system ground stations. To develop key technology for ground stations Q/V-band gateway links with very high power handling and reduced PIM.

Targeted Improvements:

To develop key technology for ground stations Q/V-band gateway links with very high power handling and reduced PIM.

Description:

In the future the High Throughput Telecommunication satellite systems (HTS) are expected to use Q/V-Band for the gateway feeder links. This will enable full use of the Ka-band for user links resulting in a dramatic increase of the overall capacity offered by the system to the end users. The Q-Band (37.5-42.5 GHz) is allocated to the downlink whereas the V-Band (47.2-51.4 GHz) is assigned to the uplink and are favoured candidates for gateway feeder links in the near future.

This activity targets the high power in-ground diplexer where the transmission is done at V-band. For this band two main issues can be raised: on the one hand, the diplexer shall withstand the power required to transmit from the ground station, on the other hand V-band is not continuous and there are areas in the spectrum where the transmission is forbidden (50.2 - 50.4 GHz is allocated to earth exploration-satellite service, all emissions are prohibited and strong rejection is required).

The development of this Q/V-band diplexer is a key enabler for future ground base stations based on Q/V-band feeder links with an efficient use of the V-band spectrum.

As first the activity shall assess possible solutions based on trade- offs related to power handling and RF performances. Thermal and mechanical aspects must also be taken into account due to the high sensitivity of the RF performance to dimensional deviations at the targeted frequency and power levels. Subsequently, a prototype shall be designed, manufactured and tested to show the suitability of the design in terms of RF performances, power handling, PIM (Product Inter Modulation), and thermal aspects.

Procurement Policy: C(1) = Activity restricted to non-prime contractors (incl. SMEs). For additional information please go to EMITS news "Industrial Policy measures for non-primes, SMEs and R&D entities in ESA programmes".

 
 

Tender Specifics