For planet earth and beyond
Projects
In this page you can search all ARTES except ARTES 20 IAP, which can be found on Business Applications - Projects.
Please click on the + symbol to expand the Filter By ARTES Elements to narrow your search. If you are looking for a specific element select from the list provided and click on the Apply button to start the search and display the results.
Displaying 1161 - 1200 of 1548
Improved Control Strategy For Geo Power Busses
Status date:
Prime Contractor
Subcontractors
Interplanetary Communication ACTION 1: Requirements Analysis
Status date:
Prime Contractor
Subcontractors
Ku Band High Power Feed Chain
Status date:
Prime Contractor
Subcontractors
10N Thruster Qualification for Eurostar
Status date:
Prime Contractor
Subcontractors
Advanced Mobile Payload Equipment
Status date:
Prime Contractor
Subcontractors
E3000 Second Generation Solar Array
Status date:
Prime Contractor
Subcontractors
GPS-AODS Demonstrator
Status date:
Prime Contractor
Subcontractors
Wideband Multi-port Power Amplifier (WMPA)
Status date:
Prime Contractor
Subcontractors
Next Generation Processor
Status date:
Prime Contractor
Subcontractors
745 Litres Propellant Tank for EUROSTAR 3000
Status date:
Prime Contractor
Subcontractors
Modular Payload Demonstrator (MPD)
Status date:
Prime Contractor
Subcontractors
Cell Inspection Criteria based on Electroluminescence (CIEL)
Status date:
Prime Contractor
Subcontractors
MMHT Phase 2
Status date:
Prime Contractor
Subcontractors
System Design of Future Communications Satellites using High Temperature Superconductors
Status date:
Prime Contractor
Subcontractors
Waveguide for S-Band TWTs
Status date:
Prime Contractor
Subcontractors
Planning the Next Generation of Broadcasting Satellites
Status date:
Prime Contractor
Subcontractors
Increased On-Orbit Autonomy of Large Platforms using Accelerometers
Status date:
Prime Contractor
Subcontractors
Advanced Electrical Architecture
Status date:
Prime Contractor
Subcontractors
Astrium Services EDRS phase 0 study
Status date:
Prime Contractor
Subcontractors
E3000 Advanced Electrical Architecture
Status date:
Prime Contractor
Subcontractors
AVISAT
Status date:
Prime Contractor
Subcontractors
UHF Broadcasting Satellite Regulatory Study
Status date:
Prime Contractor
Subcontractors
Multimedia Satellite Equipment (Li-Ion Battery for Geo Satellites)
Status date:
Prime Contractor
Subcontractors
AMETHYST
Status date:
Prime Contractor
Subcontractors
High Throughput Processor for Future Bent-Pipe Broadband Networks
Status date:
Prime Contractor
Power Supply Regulator for High-Power Communication Satellites (PSR 100V)
Status date:
Prime Contractor
Subcontractors
Protocols and Signalling for Adaptive Fade Mitigation Techniques (FMT) in DVB-RCS Multi-beam Systems: EADS Astrium
Status date:
Prime Contractor
Subcontractors
Advanced Satellite-UMTS Test Bed
Status date:
Prime Contractor
Subcontractors
Phoenix
Status date:
Prime Contractor
Subcontractors
Digital Divide: The Satellite Offer - DDSO
Status date:
Prime Contractor
COBRA
Status date:
Prime Contractor
Subcontractors
Mobile Tracking Needs
Status date:
Prime Contractor
Subcontractors
New Generation DVB-RCS Hardware
Status date:
Prime Contractor
Subcontractors
AMG4.7, 4.8, 4.9 and LSF2.1 MP1.0
Status date:
Prime Contractor
Subcontractors
THAUMAS Phase 1
Status date:
Prime Contractor
Subcontractors
THAUMAS Phase 0
Status date:
Prime Contractor
Subcontractors
PCU Low Power for TELECOM Satellite
Status date:
Prime Contractor
Subcontractors
Cospas/SarSAT Antennas
Status date: