For planet earth and beyond
Projects
In this page you can search all ARTES except ARTES 20 IAP, which can be found on Business Applications - Projects.
Please click on the + symbol to expand the Filter By ARTES Elements to narrow your search. If you are looking for a specific element select from the list provided and click on the Apply button to start the search and display the results.
Displaying 1241 - 1280 of 1557
SatCom-EASY - Enhanced IP Access System
Status date:
Prime Contractor
Subcontractors
Gas-Cell Laser Clock Technologies for Atomic Frequency Standards
Status date:
Prime Contractor
Subcontractors
Study Phase for the Development of a Single Feed Per Beam Antenna Feed Cluster Housing Assembly
Status date:
Prime Contractor
Subcontractors
Ku-Band OMUX 500 Watt per Channel
Status date:
Prime Contractor
Subcontractors
SC1000 Field Terminal
Status date:
Prime Contractor
Subcontractors
Saturn 120
Status date:
Prime Contractor
Subcontractors
Quadband mini helix TWTA
Status date:
Prime Contractor
Subcontractors
TCR Transmitter Evolution
Status date:
Prime Contractor
Subcontractors
3D Manufacturing of Microwave Passive Components
Status date:
Prime Contractor
Subcontractors
Large Propellant Tank
Status date:
Prime Contractor
Subcontractors
Plasma Propulsion Equipments for Multimedia Satellites
Status date:
Prime Contractor
Subcontractors
Integrated Space Technologies Operational System (ISTOS) For Combined Space Technology Applications
Status date:
Prime Contractor
Subcontractors
Stereoscopic Broadcasting
Status date:
Prime Contractor
Subcontractors
DCDC for RF Equipment
Status date:
Prime Contractor
Subcontractors
Software Radio Based Regenerative Processor
Status date:
Prime Contractor
Subcontractors
HORIZON
Status date:
Prime Contractor
Subcontractors
DSL in the Sky
Status date:
Prime Contractor
Subcontractors
RF Sensing Equipment in Ka Band for Eurostar 3000 Platform
Status date:
Prime Contractor
Subcontractors
S-Band Wide Coverage Antennas
Status date:
Prime Contractor
Subcontractors
Multi-Frequency Feeds
Status date:
Prime Contractor
Subcontractors
Ku-Band OMUX 500W per Channel - ComDev
Status date:
Prime Contractor
Subcontractors
ConeXpress-Orbital Life Extension Vehicle (CX-OLEV)
Status date:
Prime Contractor
Subcontractors
Mechanically Pumped Fluid Loop
Status date:
Prime Contractor
Subcontractors
J-ORTIGIA: S-band Satellite Broadcasting Experimentation Campaign through NICT ETS-VIII satellite
Status date:
Prime Contractor
Subcontractors
Hylas-1
Status date:
Prime Contractor
Subcontractors
Textile Antennas
Status date:
Prime Contractor
Subcontractors
Electromagnetic Satellite Analysis Tool
Status date:
Prime Contractor
Subcontractors
IEMN
Status date:
Prime Contractor
Subcontractors
ULtra fast Internet Satellite Switching (ULISS)
Status date:
Prime Contractor
Subcontractors
Eurostar 3000 Antenna Tracking System
Status date:
Prime Contractor
Subcontractors
MiniTerminal
Status date:
Prime Contractor
Subcontractors
Survey of the Chinese and Indian Telecom Space Industry and Market
Status date:
Prime Contractor
Subcontractors
Xenon Flow Meter for Propellant Gauging
Status date:
Prime Contractor
Subcontractors
NanOsc STOLO
Status date:
Prime Contractor
Subcontractors
2nd Generation DVB-RCS Standardization Support
Status date:
Prime Contractor
Subcontractors
Development of Diagnostic Tool - DIATOOL
Status date:
Prime Contractor
Subcontractors
Advanced Antenna Concepts for Aircraft In-Flight Entertainment
Status date: