For planet earth and beyond
Projects
In this page you can search all ARTES except ARTES 20 IAP, which can be found on Business Applications - Projects.
Please click on the + symbol to expand the Filter By ARTES Elements to narrow your search. If you are looking for a specific element select from the list provided and click on the Apply button to start the search and display the results.
Displaying 1201 - 1240 of 1562
Astrium Services EDRS phase 0 study
Status date:
Prime Contractor
Subcontractors
Protocols and Signalling for Adaptive Fade Mitigation Techniques (FMT) in DVB-RCS Multi-beam Systems: EADS Astrium
Status date:
Prime Contractor
Subcontractors
E3000 Advanced Electrical Architecture
Status date:
Prime Contractor
Subcontractors
Digital Divide: The Satellite Offer - DDSO
Status date:
Prime Contractor
AVISAT
Status date:
Prime Contractor
Subcontractors
COBRA
Status date:
Prime Contractor
Subcontractors
Mobile Tracking Needs
Status date:
Prime Contractor
Subcontractors
New Generation DVB-RCS Hardware
Status date:
Prime Contractor
Subcontractors
AMG4.7, 4.8, 4.9 and LSF2.1 MP1.0
Status date:
Prime Contractor
Subcontractors
THAUMAS Phase 1
Status date:
Prime Contractor
Subcontractors
THAUMAS Phase 0
Status date:
Prime Contractor
Subcontractors
PCU Low Power for TELECOM Satellite
Status date:
Prime Contractor
Subcontractors
Cospas/SarSAT Antennas
Status date:
Prime Contractor
Subcontractors
ISIDE
Status date:
Prime Contractor
Subcontractors
Initiative for Increased Standardisation of Performance Management in Satellite Communications
Status date:
Prime Contractor
Subcontractors
Framework Support to Standardisation: Two-way Satellite Market Survey (Euroconsult)
Status date:
Prime Contractor
Subcontractors
Research and Development of Next-Generation GNSS Receivers
Status date:
Prime Contractor
Subcontractors
K-band SATCOM ground terminal LNA with dual mode performance
Status date:
Prime Contractor
Subcontractors
AVSAT Amplifier Lineariser Study
Status date:
Prime Contractor
Subcontractors
Detailed Survey and Analysis of Danish Telecom Industry
Status date:
Prime Contractor
Subcontractors
SHEM
Status date:
Prime Contractor
Subcontractors
Low Mass Output ONET Assembly
Status date:
Prime Contractor
Subcontractors
AZUR SPACE triple solar cell 3G27/3G28 Qualification
Status date:
Prime Contractor
Subcontractors
ORELIA
Status date:
Prime Contractor
Subcontractors
Study of Generic Stream Encapsulation (GSE) Application to the DVB-Family Standards
Status date:
Prime Contractor
C/Ku Repeater Equipment
Status date:
Prime Contractor
Subcontractors
GaN Technology for Robust Communications Receivers
Status date:
Prime Contractor
Subcontractors
System and Payload Co-Design using Adaptive Coding and Modulation Schemes
Status date:
Prime Contractor
Subcontractors
Joint Turbo Decoding and Carrier Synchronisation
Status date:
Prime Contractor
Subcontractors
Development of High specific energy Li-Ion cell
Status date:
Prime Contractor
Subcontractors
Active Pixel Sensor based Star Tracker: Galileo Avionica
Status date:
Prime Contractor
Subcontractors
High Power High Temperature (HPHT) Power and Signal Slip Ring assembly (PSSR) for Large Platform Solar Array Drive Mechanisms
Status date:
Prime Contractor
Subcontractors
High Power Distribution Bar and Connections
Status date:
Prime Contractor
Subcontractors
Thin Film Solar Cell Demonstration Module
Status date: